Oil and Gas Industry client
Phosphate Hill Mine, Queensland
The client approached BLJ for installation of a new 6” line into the 12” line for 2 new Pressure Safety Valves.
BLJ technicians perform a cold cut (143mm hole) into the existing 12″ header line.
It was an effective solution – the cold cut produced a clean cut.