• Pipeline Cold Cutting

    Pipeline Cold Cutting

    Client:

    Oil and Gas Industry client

    Location:

    Phosphate Hill Mine, Queensland

    Related Services:

    Related Industries:

    Project Brief

    The client approached BLJ for installation of a new 6” line into the 12” line for 2 new Pressure Safety Valves.


    Solution

    BLJ technicians perform a cold cut (143mm hole) into the existing 12″ header line.


    Results

    It was an effective solution – the cold cut produced a clean cut.